Reward money is paid in exchange of legally acquiring the solution, implementing it to solve the problem and meeting the success criteria. Milestones for paying the reward money would depend upon the complexity of challenge and maturity of the proposed solution, which would be discussed with the solver as soon as the proposed solution is selected by us.
New

Short Description:

In the hot rolling process, bars are straightened, cut to length, and visually inspected for straightness. Manual inspection risks defects being missed and poses safety hazards. An automated system with ±1 mm precision and 8-second inspections (ideally, without stopping the line) is needed for accuracy and safety.

To submit your solution, please Login or Register on Tata innoverse

I have read and agree to Tata Innoverse Terms & Conditions and Privacy Policy

Challenge Details

In the hot rolling process, structural sections like angles and channels are straightened by a machine at the finishing stage and then bundled in a bundling machine. These bars are cut to length using a flying shear and the length of these bars range from 6 to 12 meters. At the end of this process, an operator visually inspects the bars for straightness, marking any defects by painting the tail end of the bar in yellow color. However, not all bars are inspected, which increases the risk of defective products being missed. Additionally, manual inspection poses safety risks, as workers must enter the bar conveying area, which also interrupts production. The accuracy of this process is also inconsistent, as it heavily depends on the operator’s experience. To ensure quality, bars need to be inspected along two axes—both vertical and horizontal—according to the TIS standard, which requires the straightness deviation to be within 0.3% of the product length.

The solution must ensure 100% automated inspection, eliminating human involvement to improve accuracy and safety. The system should have ±1 mm precision and complete inspections within 8 seconds to prevent delays (ideally, without stopping the line).

 